We made a complete renovation of the entire bathroom. We tore down all the tiles. We did a whole new Electrical cabling throughout the bathroom. We made the walls with plasterboard. We waterproofed all the walls and the floor and in the process we replaced both siphons with the adjacent pipes. We made a partition wall to hide the built-in toilet and 2 built-in shelves with lighting at the customer's request. We installed the new tiles according to a project. Finally, we equipped the entire bathroom, installed a PVC ceiling and installed all the lighting.
All in 28 days.